Saturday, August 20, 2011

Signal Problems Repaired

This morning, Xian Clere, Brian Semprebon, and I replaced the insulated joint across from the section house. This insulated joint has been causing some troublesome ghost signals for some time. Now that this insulated joint has been replaced, operations should be happy.

Behind the Visitor Center, a volunteer has been working on building a wall for Rails to the Darkside. The wall is of very simple construction, using shelving units to hold the wall up. Once it is constructed, maybe we can get someone to give it a coat of paint? Any volunteers?

Using our 1890's McCabe lathe powered by a traction motor with a modern tracing attachment and a template, Chris Chestnut and Pat McCann have been able to turn the wheels for New Orleans Car 836 to eliminate the thin flanges. It is a very interesting process. We have completed the first wheel and are now working on the second. A video of the process can be seen here: http://www.youtube.com/watch?v=wUdsbSysBVo. I do suggest that you turn your speakers down before watching, as the lathe does make a rather ear piercing noise.

Also in the shop, John Pelletier has been working on remounting the air compressor for Fair Haven and Westville Open Car 355. Now, we just need to re-plumb it and the car will be ready to go back into service.

In the back corner of the shop, Brooklyn Rapid Transit Car 169 has been quietly stored. Nothing has been done to the car, so tools, parts, and other things have been stored inside and up against the car. One of our newer shop volunteers, Phil Godeck has started work on the car. He has documented all of the lettering found on the car, and has removed the paint from one side of the car. The siding on the car is cracked and separating in many places so we will need to fix that, then we can begin to paint the car. Once the exterior is done, the interior will be repaired: floor replaced, seats reinstalled; and hopefully the car will be moved down to the Visitor Center. 5 Mile Beach Electric Railway (Wildwood, NJ) Open Car 36 will then most likely be moved up to the shop.

Centerville Albia & Southern Box Motor 101 is now sitting outside the shop. Chris Chestnut is planning to go through that car and get it completely serviced at the end of this year to be ready for next year. And finally, I have received word from Chris Perry; he will be coming down during the week of Labor Day to work on Boston Elevated Railway PCC Car 3100.

Monday, August 15, 2011

Wheel Turning

This past weekend, Chris Chestnut and Pat McCann took turns watching and making adjustments at the lathe. The first of car 836's wheel sets is being turned on the lathe with the first wheel nearly complete. The flange that was paper thin is now being turned down and beginning to form.

Elsewhere in the shop, John Pelletier was busy working on getting the proper hardware to install a new air compressor on car 355. This air compressor appears to be in working order, unlike the last two that once we got them under the car, they would not function properly. The last one that we put together had a high bar.

With the help of George Contrada, I was able to repair the north gate at Winkler Road Crossing after a pick-up truck damaged it on Friday. The gate will be replaced when a new one is assembled.

The rest of the day, I spent sorting through railroad ties: the good, the bad, and the ugly; so that we can get them prepared for main line tie replacement. Once those are sorted out, I need to get the tie inserter running again. Between that and the tie handler, we will have a semblance of a production job.

And, yes it is that time of year again. Galen Semprebon was caught out behind the Visitor Center unloading materials for Rails to the Darkside! In fact, the path is nearly constructed between the mainline and the Visitor Center. I guess that is my hint to begin installing the lighting.

Sunday, July 24, 2011

Catching Up

Its hard to imagine how long it has been since I have last posted. Unfortunately, long hours at work have gotten in the way of my ability to post. But enough about me, I know you are all looking for what has happened at the museum over the past two months!

Train Shed

Tracks 1 and 1A have been completed under the Train Shed of the Visitor Center. Galen Semprebon led the effort with the help of a number of other people to get the track built, temporary trackage from the siding to the storage tracks built, and the cars moved under the Train Shed. Connecticut Company car 1739 and Connecticut Company Work Car 0206 have both been moved under cover on those tracks.

New Orleans Public Service car 836

Work has been steadily progressing on car 836. Pat McCann, our resident machinist, has set up the wheel lathe with a tracing tool, and with the help of Chris Chestnut, has been preparing to make the first cut on the wheels. Yesterday, work has started on the turning of the first wheelset for 836.

Connecticut Company car 1326

While the car was in the shop for its yearly inspection and maintenance, the window sills on the car were sanded down and painted by John Pelletier, our shop foreman.

Springfield Terminal Railway car 16

John Pelletier has milled the wood to replace the floor in the operators area of the car. The floor does have a couple of weak spots that are being monitored. As time allows, the car will be moved to the shop to have the floor in that area replaced, before it becomes an issue. Phil Godeck took the time to remove the trolley hook and replace the support board underneath it. The board was detereorating and needed to be replaced. It was interesting to note, that since the car had returned to service, that hook was installed with the open part facing the wrong direction. This problem was corrected when the support board was replaced.

Illinois Terminal PCC 451

Kevin Mitchell has started to work on car 451 as his Eagle Scout Project. So far, him and his father have begun to sand down one side of the car.

Bangor & Aroostook Railroad Caboose

Work has been ongoing on the caboose. George Contrada and Xian Clere have removed the carpet and particle board that was covering the floor. While this was going on, I spent time on the roof, removing the roofing paper. Unfortunately, the roof was in worse shape than we had suspected and the roof boards will need to be replaced as well.

Track

Last weekend, I led a work crew to replace ties east of Winkler Road. In total, nine ties were replaced. We were able to use car 16 to transport people and tools, and the Tie Handler with a push car to move ties. Throughout the summer, we hope to be able to replace more ties as the time allows.

Library

Peg Hoffman has begun to work in the library cateloging the many books that we have. Meanwhile, a community service volunteer has been organizing the magazines that we have. We were surprised to find that we have quite a few complete sets of different railroad magazines.

Thursday, May 19, 2011

Flea Market Fast Approaching!

The market is still ON! As of this morning, Saturday's market is still taking place at the CT Trolley Museum. A final decision will be reached no later than 8:30pm Friday evening. If the market is being canceled, due to weather, it will be noted here by 9:30pm Friday evening.

If you have questions before the market, please contact Barbara at (860)798-5376. See you all Saturday. Set up is as early as 6am - 7:45 am. Please be patient when arriving - we will get you parked as quickly as possible.

As of today's date, we have over 110 vendor spaces rented and counting featuring a variety of items and great finds including antiques, collectibles, Revolutionary & Civil War items, military, coins, primitive items, household items, Vintage items, glassware, The Simon Foundation - animal rescue adoption day, We Adopt Greyhounds - greyhound adoption day, Party Lite Candles, furniture, Elm City Kettle Corn & Cotton Candy, All Things Beaded, Teach Art 2 Me - face painting and children's crafts, Pandora style & Murano beads, Scentsy Wickless candles,photos, Arbonne, baked goods, Pampered Chef, plants, Gary the Magic Guy, Mary Kay, bird houses, Thirty One Gifts, photos, Miche, Mary Kay, Jafra, crafts, Girl Scouts will be selling cookies, Pandora / Murano glass style beads, Tastefully Simple, clothing, plumbing items & hot tub, records, fishing lures, Tupperware, jewelry, garden items, gifts, Avon, a 13 year old custom jewelry maker and more! Come meet Corporal McNeice and Mack from the East Windsor Police Department's K-9 unit! There is something for EVERYONE at this year's market!

Space rentals may be paid by cash only! If you wish to rent a space, you'll need to contact Barbara @ (860) 798-5376 to make arrangements! Spaces are limited so don't wait!

Additional parking is available at Golden Gavel (Route 140). Shuttle bus will run every 20 minutes.

Interior Decorating

Or should I say Interior Demolition? Xian Clere has started aggressively working on the Bangor and Aroostook Caboose. While the interior for the most part is staying as is, the floor will be replaced. After we moved the caboose, we noticed that the floor was buckling. Initially, we thought that this was because of the move. Once we started pulling up the carpet, we found out that it was, in fact, because under the carpet was particle board. Water had made its way down under the carpet and the particle board had warped. George Contrada started working on the carpet on Saturday. Tuesday, Xian and I got together and finished pulling up the carpet and started pulling up the particle board. Under the particle board was 1" dense foam board which is the reason why the floor is so thick. We will most likely need to replace some of the foam board under the floor because some of that was wet as well. At least now the caboose is under the Visitor Center Train Shed so that it can dry out and work can begin.

Sunday, May 15, 2011

Rail Bonds

Throughout the day Saturday, Ben Wallace and I had to look for the tools to replace rail bonds. Once we were able to find what we needed (some tools being in the car shop), we proceeded out on the line and replaced two rail bonds. The rail bonds are necessary to allow for the signal system to function properly.

Up in the car shop, John Pelletier and Galen Semprebon were working with a crew of people to set up a gantry over the wheel lathe. This will be used to hoist the wheel set (wheels and axle) up onto the lathe for turning the wheels down. The wheel sets on New Orleans Car 836 are set to be turned down to eliminate the thin flanges that are on the wheels. Also, work was progressing on Illinois Terminal PCC 451. The "rain gutters" on the side of the car were sanded down and primed and work was ongoing on fixing a rot hole on the side of the car.

In Kelly Yard, Xian Clere has worked with Rob Levesque and Brandon Clark to replace the broken rail. The old rail was removed and the new rail was installed over the week. After borrowing a drill from the fire museum, holes for the guard rail bolts were drilled in the new rail and the guard rail was installed. There is still more work to be accomplished in Kelly Yard, but it is much better than it was at the end of last season.

Work is also progressing on the Bangor & Aroostook Railroad Caboose. George Contrada stripped the carpet from the interior of the caboose. Soon, the siding will be stripped and replaced.

Be sure to stop down for the Flea Market at the museum on this coming Saturday, May 21st! There will be over 100 vendors!

Monday, May 2, 2011

Cleaning

On Sunday, Camilo Santiago took the initiative to clean the Members Room. Since the beginning of the year, extraneous materials have been stored in the Members Room and a lot of dirt has been tracked in from outside. Now, the room has been cleaned up and is a comfortable place for volunteers to hang out, eat lunch, and relax after a hard days work.

Out by the section house, I was working on cleaning the grounds. When the section house was being restored, some of the track tools were stored under a tarp outside. The tools have now been moved back into the section house. While I was doing that, I found three level boards. A level board is used to check how much elevation is built into the track. For example, if the level board reads an inch of elevation on the east rail, that means that the east rail is an inch higher than the west rail. For the past few years, we have been using a homemade level board.

Remember, the Annual Meeting is this coming Saturday at 5pm. Earlier in the day, at 2pm, there will be a ceremony for the presentation of the donation from the WLPA.