Showing posts with label Road Crossings. Show all posts
Showing posts with label Road Crossings. Show all posts
Saturday, January 14, 2012
Signal Lights
At the beginning of the week, I had received a call that a pallet of used crossing signal lights were available for the taking. This comes as many railroads are switching to LED crossing signal lights. The catch was that we had to pick them up this week. Last night, Al Goff and I met and loaded them in the back of my pick up. There were three large boxes that we had to consolidate into two boxes (all three would not fit in the bed of my truck). With these signal lights, we will be able to replace some of ours that need replacing and we will also be able to use them for parts to repair them as necessary.
Monday, August 15, 2011
Wheel Turning
This past weekend, Chris Chestnut and Pat McCann took turns watching and making adjustments at the lathe. The first of car 836's wheel sets is being turned on the lathe with the first wheel nearly complete. The flange that was paper thin is now being turned down and beginning to form.
Elsewhere in the shop, John Pelletier was busy working on getting the proper hardware to install a new air compressor on car 355. This air compressor appears to be in working order, unlike the last two that once we got them under the car, they would not function properly. The last one that we put together had a high bar.
With the help of George Contrada, I was able to repair the north gate at Winkler Road Crossing after a pick-up truck damaged it on Friday. The gate will be replaced when a new one is assembled.
The rest of the day, I spent sorting through railroad ties: the good, the bad, and the ugly; so that we can get them prepared for main line tie replacement. Once those are sorted out, I need to get the tie inserter running again. Between that and the tie handler, we will have a semblance of a production job.
And, yes it is that time of year again. Galen Semprebon was caught out behind the Visitor Center unloading materials for Rails to the Darkside! In fact, the path is nearly constructed between the mainline and the Visitor Center. I guess that is my hint to begin installing the lighting.
Elsewhere in the shop, John Pelletier was busy working on getting the proper hardware to install a new air compressor on car 355. This air compressor appears to be in working order, unlike the last two that once we got them under the car, they would not function properly. The last one that we put together had a high bar.
With the help of George Contrada, I was able to repair the north gate at Winkler Road Crossing after a pick-up truck damaged it on Friday. The gate will be replaced when a new one is assembled.
The rest of the day, I spent sorting through railroad ties: the good, the bad, and the ugly; so that we can get them prepared for main line tie replacement. Once those are sorted out, I need to get the tie inserter running again. Between that and the tie handler, we will have a semblance of a production job.
And, yes it is that time of year again. Galen Semprebon was caught out behind the Visitor Center unloading materials for Rails to the Darkside! In fact, the path is nearly constructed between the mainline and the Visitor Center. I guess that is my hint to begin installing the lighting.
Thursday, October 21, 2010
Winkler Road Rebuilding

Yesterday and today, crews have been working to replace the Winkler Road Crossing. When the crossing was first built, ties were used along the inside of the rail in order to create the flange way. Over time, those ties have rotten and the pavement has sagged creating a very bumpy crossing. Half of the crossing was replaced yesterday with new rubber guards and pavement. The other half will be finished by the end of the day today. Thank you to Andy Cotton, Amber Hurrle, and the rest of their crew for helping out with traffic.
John Pelletier was able to find the cause of the air compressor issue on car 355 today. Apparently, the set screw that holds one of the bearings in place had worked itself loose and caused the bearing to spin and jam. Unfortunately, he found this out AFTER removing the air compressor from the car. This problem could have been solved without removing it.
Saturday, August 14, 2010
After 61 Years Outside...
In 1949, ConnCo 0309 (Fair Haven and Westville curve side 154) was moved by the Connecticut Electric Railway out of the James Street Car House in New Haven, CT to the museum. This was the last time the car was stored inside. For the next sixty-one years, the car sat at the museum outside.
It was unloaded at the Winkler Road crossing on a 50 foot section of track in the middle of the woods. It stayed there until the track was extended to Winkler Road. Then it was moved to the main property where it sat at the end of Hartman Siding. Today, the car was moved under cover again by Galen Semprebon, Matty Doane, George Contrada, and Ted Coppola. And it looks pretty good for sitting outside for the past sixty-one years.
Once the car was moved under the train shed, the tarps were removed. Under the tarps were wood sheathing and tar paper that covered the car. That was removed, and we looked around inside the car. Inside the car, we found many overhead parts including insulators, and parts such as seats to other cars.
I did not see it happen, but I am told that the broken gate at Winkler Road was replaced.
Because of so much going on at the front of the property, I did not get a chance to get to the shop to see what was going on up there. Tomorrow will be another busy day starting in the morning when we go out to Mansfield to pick up some of the tables and chairs from the BAR Caboose.
It was unloaded at the Winkler Road crossing on a 50 foot section of track in the middle of the woods. It stayed there until the track was extended to Winkler Road. Then it was moved to the main property where it sat at the end of Hartman Siding. Today, the car was moved under cover again by Galen Semprebon, Matty Doane, George Contrada, and Ted Coppola. And it looks pretty good for sitting outside for the past sixty-one years.
Once the car was moved under the train shed, the tarps were removed. Under the tarps were wood sheathing and tar paper that covered the car. That was removed, and we looked around inside the car. Inside the car, we found many overhead parts including insulators, and parts such as seats to other cars.
I did not see it happen, but I am told that the broken gate at Winkler Road was replaced.
Because of so much going on at the front of the property, I did not get a chance to get to the shop to see what was going on up there. Tomorrow will be another busy day starting in the morning when we go out to Mansfield to pick up some of the tables and chairs from the BAR Caboose.
Sunday, August 8, 2010
Hartman Siding Lay-Up Almost Clear
Once we got to the special work, we had to hook the bulldozer up to one side to act as a brake, and the excavator to the other to keep the left wheels against the rail. This is the area where the Lay-Up was joined into the Visitor Center Lead. In order to accomplish this without cutting rail, we connected one rail at a joint. The other rail just ends and the wheels ride over a series of greased tie plates until it falls onto the stock rail of the siding. Its not built for high speed operation, but it will work to get the cars out. The whole Lay-Up track will be removed after this is done anyways. Car 771 made it through the special work much easier than 1739 had. 1739 took a couple of weekends to do, whereas 771 took only a few hours.
John Pelletier was busy in the shop replacing broken windows in the Type 5. With the help of a Community Service Volunteer, he made considerable progress in cleaning the shop as well.
Friday, July 30, 2010
Insulated Joints
Meanwhile, up in the shop, Chris Perry was hard at work on Boston Elevated PCC 3100. He has the whole car sanded down and was able to prime and paint the roof. The idea is to get a coat of paint over the car so that it is less prone to rusting. Then, replace the panels on the car that are missing or bad and repaint the car with the proper paint and color.
Thursday, July 15, 2010
Crossing Repairs
As I arrived at the museum for the Board of Directors meeting yesterday, I was informed by operations that a gate at the Winkler Road Crossing was hit during the course of the day. We have new gate components for the crossing, however, the new gates are not fully assembled. I was able to draft the help of Xian Clere, Chris Shaw, and Mike Caputo in fixing the gate. It is a temporary repair at best, but it will get us by until the weekend when the new gate can be finished and installed.
Subscribe to:
Posts (Atom)