Monday, April 30, 2012

Machinery Set Up

In the Lusa Car Shop, Galen Semprebon, Brian Semprebon, and John Pelletier have been able to get the dust collector set up and running.  Now, the wood shop is taking shape.  Machines are being placed in strategic locations and they are preparing to order the duct work for the machines.

Springfield Terminal car 16 is nearly ready to be returned to service, with newly painted steps & bumpers, a repaired roof & floor, and wiring for headlights!

After operations ceased, Ben Wallace, Al Goff, Xian Clere, John Gasper, Aaron Mangan, and I  went out on the line car to repair some issues with the signal system.  We were able to replace a cross arm bracket that had failed near Hancock Siding.  Other work was supposed to continue on Sunday.

Saturday, April 21, 2012

Shop Work

Up in the car shop, Galen Semprebon and Brian Semprebon were hard at work getting the dust collector put together. It is now up and running. At this time, the wood working machines can be rearranged and set up for use. Pat McCann and John Pelletier spent the day working on Springfield Terminal Railway car 16 preparing her to be released into service. John was able to sand and revarnish the window trim on the car.

In Kelly Yard, Kevin Mitchell and those helping him with his Eagle Scout Project were working diligently on Illinois Terminal car 451. The windows have been removed in order to prepare the car for painting.

Over by the Dining Car, Marilyn Rodriguez helped me clean up the entrance by removing the old lattice fencing and put up newer picket fencing. This really spruced up the area.

Monday, April 16, 2012

Tie Replacement

On Saturday, we were able to replace 10 ties between Woods Barn Turnout and Borrup Road. Neil Newman, Xian Clere, Andy Cotton, Brian Semprebon, Dave Coppola, John Gasper, Aaron Mangan, and another volunteer helped me with tie replacement. We are hoping to get the tie handler and tie inserter running better so that we can use those machines to do tie replacement which will allow us to replace more ties in one session.

In the shop, Galen Semprebon worked on setting up the woodshop equipment in the car shop. John Pelletier repaired the hand brake on Line Car S-193. The brake cable had snapped, but luckily there was enough of it left to restring the brake cable. He also continued work on the electrical for the headlights on Springfield Terminal Railway car 16. Pat McCann repainted the bumpers on car 16 as well.

On Sunday, Camilo Santiago continued work on the Reading Caboose.

Pending weather, another track work session will take place this coming Saturday April 21st, 2012. We will either be working on replacing ties in the area between Borrup Road and the Hartman Siding Switch or removing spikes from relay ties to reuse.

Wednesday, February 8, 2012

Set Up of Visitor Center

The set up in the Visitor Center has continued. Galen & Brian Semprebon were able to move the remaining cars in place. We will wait until after Cabin Fever Days to move the Bobber Caboose inside since we will need that space for people to congregate during the event. Larry Lunden continued to sweep up after the mess that is created when we are working in the Visitor Center. While this doesn't seem like a glamorous or helpful job, it is something that NEEDS to be done and many of us don't have the desire to do this after a days work. Thank you Larry for doing this!

Roger Pierson and Matt Januska continued to work on Springfield Street Railway car 575 (Montreal 2056) removing paint. When they are done, we will be able to repaint it in Springfield, Mass colors.

Up in the shop, John Pelletier has been working on Springfield Terminal Railway car 16.

In the background, JF Smith has been working on a NEW handout for this coming season as well as the next series of Trading Cards!

Sunday, January 15, 2012

Paint Removal

Much progress was made on Montreal Tramways car 2056, or should I say Springfield Street Railway 575 (which is what the car will be repainted as), by Roger Pierson, Matt Januska, and Larry Lunden. They spent time throughout the day yesterday scraping paint off of the car with Roger working on the car the whole day! While they were working on the side of the car, I was able to remove the dash for the lights on the end of the car on the east end. This was added on by Montreal and was not part of the car when the car was run in Springfield, MA. While doing this, I noticed that the base of the center end window was rotted and crumbling, so I removed that as well. Hopefully I can find someone who is skilled in woodworking that has time to remake the end window.

I also spent some time working on removing two of the broken windows in Springfield Terminal Railway car 10. The glass will need to be replaced in the windows and then reinstalled. Larry cleaned out the car from what was left inside it after Rails to the Darkside.

Galen Semprebon spent the afternoon working on cars 1201 and 154. Inside Cleveland car 1201, Galen repainted the floors and the conductors stand. Both were well worn. On the other side of the hall, Galen removed some of the aluminium that was covering the clerestory windows on Fair Haven & Westville car 154 and primed the exterior of the clerestory.

George Contrada, Ted Coppola, Dave Coppola, and Brian Semprebon started to dismantle load the Winterfest layouts into the trailers.

Up in the shop, John Pelletier was busy working on Springfield Terminal Railway car 16. He is currently replacing a section of roof that was rotted above the motorman in the baggage compartment.

John Gasper with some help from other Fire Museum members were able to remove the alternator from the Bucket Truck which will be rebuilt. Next season we should have a fully functional Bucket Truck.

Sunday, January 1, 2012

Floor Replacement

Work on the floor of the operator's vestibule of Springfield Terminal Railway car 16 has commenced. The floor between the controller and the step has been removed and replaced with new wood. Over the years, the floor has worn paper-thin from the foot traffic through the car. The new tongue-and-groove flooring has been installed and will be painted once the warmer weather in the spring allows. This winter, we hope to assemble a complete set of heaters for the car and wire and install golden glow headlights on the car.

On the other track in the shop, Boston Elevated Railway car 5645 has been jacked and the motors removed. One armature was sent out to an electrical repair shop and repaired. Now that it was returned, a second will be sent out. Meanwhile, inside the car, the floor is being replaced where it has buckled.

Back in the Visitor Center, work is progressing quite quickly in disassembling Winterfest. The G Gauge table is almost completely disassembled. Soon, we will be able to move cars back into the Visitor Center.

Sunday, July 24, 2011

Catching Up

Its hard to imagine how long it has been since I have last posted. Unfortunately, long hours at work have gotten in the way of my ability to post. But enough about me, I know you are all looking for what has happened at the museum over the past two months!

Train Shed

Tracks 1 and 1A have been completed under the Train Shed of the Visitor Center. Galen Semprebon led the effort with the help of a number of other people to get the track built, temporary trackage from the siding to the storage tracks built, and the cars moved under the Train Shed. Connecticut Company car 1739 and Connecticut Company Work Car 0206 have both been moved under cover on those tracks.

New Orleans Public Service car 836

Work has been steadily progressing on car 836. Pat McCann, our resident machinist, has set up the wheel lathe with a tracing tool, and with the help of Chris Chestnut, has been preparing to make the first cut on the wheels. Yesterday, work has started on the turning of the first wheelset for 836.

Connecticut Company car 1326

While the car was in the shop for its yearly inspection and maintenance, the window sills on the car were sanded down and painted by John Pelletier, our shop foreman.

Springfield Terminal Railway car 16

John Pelletier has milled the wood to replace the floor in the operators area of the car. The floor does have a couple of weak spots that are being monitored. As time allows, the car will be moved to the shop to have the floor in that area replaced, before it becomes an issue. Phil Godeck took the time to remove the trolley hook and replace the support board underneath it. The board was detereorating and needed to be replaced. It was interesting to note, that since the car had returned to service, that hook was installed with the open part facing the wrong direction. This problem was corrected when the support board was replaced.

Illinois Terminal PCC 451

Kevin Mitchell has started to work on car 451 as his Eagle Scout Project. So far, him and his father have begun to sand down one side of the car.

Bangor & Aroostook Railroad Caboose

Work has been ongoing on the caboose. George Contrada and Xian Clere have removed the carpet and particle board that was covering the floor. While this was going on, I spent time on the roof, removing the roofing paper. Unfortunately, the roof was in worse shape than we had suspected and the roof boards will need to be replaced as well.

Track

Last weekend, I led a work crew to replace ties east of Winkler Road. In total, nine ties were replaced. We were able to use car 16 to transport people and tools, and the Tie Handler with a push car to move ties. Throughout the summer, we hope to be able to replace more ties as the time allows.

Library

Peg Hoffman has begun to work in the library cateloging the many books that we have. Meanwhile, a community service volunteer has been organizing the magazines that we have. We were surprised to find that we have quite a few complete sets of different railroad magazines.

Sunday, May 1, 2011

More Car Shifting

Most of the progress during the day on Saturday included shifting of various cars in preparation for the Annual Meeting.

First thing in the morning, Bill Wall and Bill Pollman stopped by the museum with tires and rims for the trolley bus that is scheduled to be shipped down to Baltimore. They have a similar trolley bus, but they need one of ours (we have three) for parts. The one big hurdle in getting the bus shipped is that it had no tires on it.

George Contrada, Galen Semprebon, Ted Coppola, John Cummins, Dave Coppola and I worked to move the Bangor & Aroostook Railroad Caboose under the Train Shed. In order to do this, we needed to pull the caboose down to the Powerhouse Crossing on the Visitor Center lead tracks so that the access track could be shifted over 2 bays. Then the caboose was pulled back up and pushed under the Train Shed.

Xian Clere and Camilo Santiago worked with Northern Tree Service of Palmer, MA to move around 700 relay ties that have been donated to the museum. The ties are now sitting on the back road to the loop.

Up in the shop, John Pelletier was working with another volunteer to service additional cars. They were able to finish working on Fair Haven & Westville Railroad Car 355 and Illinois Terminal PCC 451. Later in the day, Springfield Terminal Car 16 was brought up to the shop and minor repairs were continued on the car.

After operations was finished for the day, Camilo Santiago, Xian Clere, George Contrada, and John Cummins completed a switching operation which included moving the Reading Caboose to the North Road Lay-Up Track and clearing the Northern Barn Lead so that Aurora Elgin & Chicago Interurban 303 can be moved out for the Annual Meeting next weekend.

Morgan von Eisengrein spent the day working diligently in the office with the planning of our new fund raising event for this year, BBQ on the Line. More information on the event will be forthcoming.

Sunday, September 26, 2010

Tornado hits Museum's Trailers

Actually, it wasn't exactly a tornado, but it sure looks like one has hit. On Saturday, Todd and Paul Chicoine spent the day getting another trailer ready to be removed from the property. One of the main goals this year has been to clean up the property. We have accomplished quite a lot by getting rid of the trailers in the parking lot, the scrap metal pile inside the loop, the junk stored underneath the train shed, and moving the three Connecticut Company cars out of the Hartman's Siding Lay Up track. In addition, we cleaned up the gardens in front of the Visitor Center and installed a fence between the parking lot and front lawn. Paul and Todd emptied out the trailer of the materials stored in it. Everything inside the trailer was moved to the storage room off of the gift shop. Then, with the help of the front end loader, the trailer was crushed. The trailer should be removed from the property by next weekend.

Xian Clere used the afternoon to continue to clean out the Bangor & Aroostook Caboose. He brought a vacuum out to the caboose to clean the floor and cushions. We are still looking for donations to help offset the cost of moving the caboose and the work that the caboose needs.

Rails to the Darkside has progressed much over the weekend. The set up of the main hall is almost completed with all of the curtains in place and the lighting set up. The Graveyard posts have been set up with the gravestones, lighting, and fencing. We gained a couple of new cast members at the Rails to the Darkside Casting Call, however, we are still looking for more cast. A rehearsal is scheduled for Thursday night. If you are interested in helping out for Rails to the Darkside, contact office@ceraweb.org.

Up in the shop, John Pelletier and Pat McCann began setting up the storage pod. The storage pod will be used to store paints, oils, and other flammable materials so they are not stored in the car shop. Boston Elevated 5645 has been released from the shop. While in the shop, whistles were installed on the car, door motors were repaired, and missing windows were replaced. Springfield Terminal 16 was moved up to the shop to have windows repaired and the motor support bearings repacked.

Saturday, July 10, 2010

Shop Cleanup

Today a lot of discussion occurred in how best to organize the Lusa Car Shop. After discussing what machines should stay in the shop and what machines should be moved to other storage areas, a plan of action was made to get the shop in order. Pat McCann and Matty Doane kept busy today with the backhoe cleaning out the shop. It seems that trash gets piled up faster than it is taken away. They were able to empty all of the shop barrels into the dumpster and bring a lot of old wood to the wood pile.

I was finally able to replace the trolley pole rope on Montreal 2600 today as we received our order of trolley rope from the manufacturer last week. Eventually Rio 1850, Montreal 4, and Connecticut 1326 will have new rope too, but 2600's was in the worst condition.

John Pelletier was able to finish the roof work on Springfield Terminal 16. While the roof on the car is not the best looking, it should be watertight. The car really needs a new canvas, however, there are other things that need to happen to the car before a new canvas can be put on the car. The Boston Type-5 was switched with 16 to put it in the shop. The roof on the Type-5 is next on the list to be repaired.

Illinois Terminal 451 was brought over the pit today to diagnose and repair the braking problem. The car has been sidelined from service for the past few months because of a delay between the dynamic brakes and the friction brakes. Unfortunately, I had to leave before the crew was finished looking over the car so I do not know if they found the issue.



Just outside the shop, George Contrada was busy turning an old track crane into a flat car for the Track Department. The crane was missing parts and all over not functional. Since the Track Department was in need of a sturdy flat car for moving tools and ties, George took on the task of building them one.




On the front side of the property, Galen Semprebon has been busy leading a crew of volunteers moving the three Connecticut Company cars off of the Hartman Storage Track. When the Visitor Center was built, this section of track was disconnected and the end was buried. In order to get the three cars out, the track was dug out and partially reconnected. ConnCo 1739 is most of the way off of the track. In the coming weeks, ConnCo 771 & 154 will be moved off of the track and the track will be removed.

Overall it was a very productive day. Next weekend calls for the pilot to be installed on CA&E 303, car moves, and more clean up in the shop.