The downside of this weekend was that it was a complete washout.  The upside, a lot of work was accomplished in the shop.

First, Vacuum Impregnation.  We knew it worked, but did not know how well it actually worked.  We were splicing ends of wires on the Field Coils for the Boston Elevated 5645 and had to cut a sizable length of wire off.  When we cut about 4 inches of wire, we noticed that the varnish had worked its way up the wire between each individual strand.  Now we know why it took a half gallon of varnish for one set of Field Coils.

Second, Floor Replacement.  Also in the Type 5, Scott has been hard at work replacing the floor in the car.  One side is completely finished.  The seats have been put back in place but not completely bolted down.  He has begun to remove the seats from the other side of the car.

Third, Milling.  While this was for the Fire Museum, it was still work that was accomplished this weekend.  Pat McCann had a piece of metal stock in the lathe and was working on milling a new piece for one of the fire trucks.  What the piece was, I am not sure.  The only thing that I am certain of is that it was broken.  It is amazing what we now have in the shop for abilities.

Fourth, Engine Repair.  Now we have migrated over to the Bus Museum.  One of the Buses had developed a leak which we thought was due to a blown head gasket.  While John Gasper was tearing down the engine, he found out that the cause was only a missing bolt, which happened to be laying in the engine compartment waiting to be installed.  Luckily he did not pull the heads yet and was able to replace the bolt, put the engine back together and get he bus running.

It was quite a busy day at the museum for the shop staff.  In addition, many small things were accomplished.  Two seats for New Orleans car 836 were repaired in the shop by John Pelletier.  George Contrada assisted me in removing the rest of the metal straps from the side of Brooklyn Rapid Transit car 169.  I was able to get a coat of primer on more wood for the Bangor & Aroostook Caboose.  Xian Clere installed new seats in the rear of the newly acquired 1975 American-LaFrance from Ellington.

I wouldn't be telling the whole story if I did not talk about the work that occurred during the week as well.  Work on the Dining Car...No, I cannot call it the dining car.  I hate that term for it since it never was a dining car in service, even though everyone knows it as such.  Work on New York, New Haven & Hartford Railroad combine 2765 is progressing.  The new sill has been installed on the east side of the car which will stop the rain from entering the car from under the windows.  The car still needs to have the sill on the west side replaced and the roof repaired.  At that point it should once again be watertight.  Then, we will need to replace some of the siding on the car to make it look aesthetically pleasing.

I will close while telling you about something new.  Starting this week, I plan to start hosting Thursday evening work sessions.  The work session will begin around 5pm and we will work until we decide to call it quits.  Quite a few railroad museums do this, because we cannot get enough done on the weekend.  Our primary project will be working on the Bangor & Aroostook Caboose.  However, if we get enough people, there is plenty else to work on.  Any questions, or if you wish to help out, please let me know...tlesniak@ceraweb.org.

Wednesday, January 11, 2012

One Comes Off, Another Goes On

Tarps that is. Marilyn Rodriguez was busy Saturday with Brian Semprebon, Dave Coppola, Matt Januska, and Roger Pierson working to get the Dining Car and Philadelphia and Reading Coach covered with tarps.

While she was doing that, I was removing tarps (from the cars that I had been able to get back under the Visitor Center). A lot of clean up was accomplished inside the main hall. Almost all of Winterfest has been broken down. Galen Semprebon has even begun to load the Winterfest Trailers. Car 10 and the Ponemah Mills Locomotive have been moved back into the main hall with help from Marilyn and Will Yungk. Next weekend we hope to be able to get the Bobber Caboose into the Visitor Center which will allow the Bangor & Aroostook Caboose under the train shed.

Across the parking lot, members of the Fire Museum were able to remove the hydraulic cylinders from the Bucket Truck to get them shipped out to be repacked.

I didn't get a chance to see what was going on in the shop. I did catch John Pelletier for a brief moment in the Visitor Center repairing a window for New Orleans Car 836.

Monday, December 26, 2011

A Year in Review

This year has been quite a busy year with many accomplishments, least important for this blog is my own accomplishments in my personal life. Those are what have been keeping me from having time to post on here. As a new year approaches, I plan to be posting much more often and will try to post at minimum once a week. If I am not posting that often, feel free to let me know; remind me to post.

January: Work began on Springfield Street Railway car 575 (Montreal Tramways car 2056). Paint was scraped from the sides of the car in hopes to repaint it in Springfield, MA colors. Work was also accomplished on Connecticut Company car 65.

February: The northeast was hammered with snow which really slowed down work at the museum. It was difficult to even access the property.

March: The Main Hall was set up for opening day. The fourth motor was repaired and reinstalled in Montreal Tramways car 2600.

April: The front lawn was cleaned up of miscellaneous materials. Track 1 under the Visitor Center Train Shed was built and ties were replaced in Kelly Yard.

May: The museum received approximately 700 relay ties to be used in the Train Shed and on the main line. Work began on the floor and roof of the Bangor & Aroostook Caboose.

June: Work progressed on the Bangor & Aroostook Caboose. Work also began on the interior of the Reading Caboose. Work began on New Orleans car 836 to turn down the wheel set with a thin flange.

July: Work continued on the Reading Caboose and car 836. In addition, Illinois Terminal car 451 had work continued on it as an Eagle Scout Project.

August: Work on many projects slowed due to planning our special events - Rails to the Darkside, Pumpkin Patch, and Winterfest. New Orleans car 836 still had members working on the wheel sets. At the end of the month, Hurricane Irene hit the museum resulting in the museum being closed for a week.

September: The finishing touches were in the process of being completed on car 836. Repairs were made to the infrastructure after Hurricane Irene. Work was accomplished on the cosmetic restoration of Boston Elevated car 3100. Cars were tarped to protect them from the elements.

October: New Orleans car 836 was returned to service, however, Connecticut Company car 1326 was removed from service due to motor issues. Winter Storm Alfred hit the museum at the end of the month resulting in the museum being closed for its typically two best days of Pumpkin Patch and Rails to the Darkside.

November: Repairs were made to the infrastructure once again. The museum was set up for Winterfest.

December: Work was progressing on the Boston Elevated Railway car 5645 with interior woodwork and motor work. Tarps are going on the Dining Car to protect it from the winter snow. Next year, money will be spent to repair the car.

Sunday, September 18, 2011

Parts!

Saturday, the parts that we had received as part of the Trolleyville sale finally arrived. The truck pulled into the museum at around 8pm. Luckily, the Fire Museum was able to provide lights to allow us to see what we were doing during the unloading process. Galen Semprebon, George Contrada, Marilyn Rodriguez, Xian Clere, Aaron Mangan, John Pelletier, and I stuck around the museum until after 11pm in order to get the trailer unloaded. This was a sigh of relief because we have been waiting nearly two years for this trailer and were getting ready to travel to Cleveland to pick the parts up.

The rest of the day was quite eventful as well. Marilyn and I were able to shuffle some cars around in front of the shop. Boston Elevated PCC 3100 is now back on the Northern Barn Lead and the Centerville Albia & Southern Box Motor 101 is now in front of Lusa Shop track 2 allowing Fair Haven & Westville car 355 out of the shop. A few members of operations helped out as well, happy to see 355 able to come out of the shop again.

Pat McCann was once again turning down the wheels for New Orleans car 836. He is nearly complete with that task. John was further back in the shop continuing to work on Brooklyn Rapid Transit car 169.

On the front side of the property, Galen was busy doing more Rails to the Darkside setup. We were able to take care of some housekeeping things around the Snack Bar building and Dining Car. Since the Snack Bar is closed, the sign has been taken down. The broken railings and such on the staircase to the dining car have been removed as well.

Wednesday, September 14, 2011

Tarping Cars

Over the weekend, Marilyn Rodriguez helped me tarp some of our fleet that sits outside. Normally it is like pulling teeth to get help doing such a mundane task. However, Saturday afternoon, we were able to get tarps over Connecticut Company express motor 2023, Chicago Elevated Railway car 4284, and the end of the Bangor & Aroostook Caboose. The previous weekend, I was able to tarp Chicago North Shore & Milwaukee car 162, and Chris Perry tarped Boston Elevated Railway car 3100.

Speaking of car 3100, Chris Perry has made quite a bit of progress on the car. Most of the car is sitting in a coat of bright orange paint, its original color. This is just a base coat to get some paint on the car to slow down the rusting and by no means the final coat. Nonetheless, the car is progressing along.

And, the caboose is progressing as well. George Contrada took the final measurements and is ordering the wood for the roof and the sides of the car. We were able to find the right style and width wood at just over a dollar a linear foot.

Galen Semprebon has been leading the setup for Rails to the Darkside. The cars within the Visitor Center have been moved into place and decorating has begun. We have also come up with a new layout for Winterfest. I will keep that under wraps so you will have to come to that event in December to find out.

The shop is still busy as ever with John Pelletier working on both New Orleans Public Service car 836 repairing the seats and doing general maintenance on the car and working on cleaning up and putting final touches on Fair Haven & Westville car 355. Pat McCann continues to turn the wheels for car 836.

Saturday, September 3, 2011

Back up and Running

Friday was a very busy day at the museum. No not with visitors; unfortunately we were still closed due to the damage as a result of Hurricane Irene. Al Goff, Ben Wallace, John Cummins, and George Contrada spent the day hanging then 2200 volt signal line back in then air. The line fell and snapped when a tree fell on it. The trees also caused damage to numerous poles and cross arms. After working at our real jobs, Xian Clere, Aaron Mangan, and I showed up to help finish the job.

Galen Semprebon installed the new windows for the Visitor Center to replace the ones that were broken when the museum was vandalized a month ago.

Up in the car shop, Chris Chestnut spent the day turning down a wheel for New Orleans car 836 on the wheel lathe.

Sunday, August 28, 2011

Hurricane

With Hurricane Irene slamming Connecticut today, the museum has been closed. Yesterday we took the time to tie down anything that may fly away. The biggest concern is trees that may fall down on buildings or equipment.

Chris Chestnut spent the day turning the wheels on the lathe for New Orleans car 836. They are coming along quite well and we hope to have the car returned to service by the end of September.

In the back of the shop, I began my day pulling the floor up in Brooklyn Rapid Transit car 169. The floor was in such poor shape, most of it pulled up with just my hands. Under one of the seats, I found an interesting switch. It turned out it was actually the heater switch as it said "Consolidated Car Heating Company" on the side of it. Phil Godeck was working on the outside of the car removing paint.

John Pelletier was able to get the air compressor running in Fair Haven & Westville car 355 and the car should be back in service over the next couple of weeks.

During the heavy rain, Galen & Brian Semprebon spent time in the library organizing magazines and removing duplicates. Peg Hoffman now has over 500 books cataloged. The library is coming together.

Later in the day, I got to work some more on the Bangor & Aroostook Caboose. I have just about finished stripping the tar-paper off of the roof. George Contrada is working on getting the wood for the side and roof of the caboose.

Saturday, August 20, 2011

Signal Problems Repaired

This morning, Xian Clere, Brian Semprebon, and I replaced the insulated joint across from the section house. This insulated joint has been causing some troublesome ghost signals for some time. Now that this insulated joint has been replaced, operations should be happy.

Behind the Visitor Center, a volunteer has been working on building a wall for Rails to the Darkside. The wall is of very simple construction, using shelving units to hold the wall up. Once it is constructed, maybe we can get someone to give it a coat of paint? Any volunteers?

Using our 1890's McCabe lathe powered by a traction motor with a modern tracing attachment and a template, Chris Chestnut and Pat McCann have been able to turn the wheels for New Orleans Car 836 to eliminate the thin flanges. It is a very interesting process. We have completed the first wheel and are now working on the second. A video of the process can be seen here: http://www.youtube.com/watch?v=wUdsbSysBVo. I do suggest that you turn your speakers down before watching, as the lathe does make a rather ear piercing noise.

Also in the shop, John Pelletier has been working on remounting the air compressor for Fair Haven and Westville Open Car 355. Now, we just need to re-plumb it and the car will be ready to go back into service.

In the back corner of the shop, Brooklyn Rapid Transit Car 169 has been quietly stored. Nothing has been done to the car, so tools, parts, and other things have been stored inside and up against the car. One of our newer shop volunteers, Phil Godeck has started work on the car. He has documented all of the lettering found on the car, and has removed the paint from one side of the car. The siding on the car is cracked and separating in many places so we will need to fix that, then we can begin to paint the car. Once the exterior is done, the interior will be repaired: floor replaced, seats reinstalled; and hopefully the car will be moved down to the Visitor Center. 5 Mile Beach Electric Railway (Wildwood, NJ) Open Car 36 will then most likely be moved up to the shop.

Centerville Albia & Southern Box Motor 101 is now sitting outside the shop. Chris Chestnut is planning to go through that car and get it completely serviced at the end of this year to be ready for next year. And finally, I have received word from Chris Perry; he will be coming down during the week of Labor Day to work on Boston Elevated Railway PCC Car 3100.

Monday, August 15, 2011

Wheel Turning

This past weekend, Chris Chestnut and Pat McCann took turns watching and making adjustments at the lathe. The first of car 836's wheel sets is being turned on the lathe with the first wheel nearly complete. The flange that was paper thin is now being turned down and beginning to form.

Elsewhere in the shop, John Pelletier was busy working on getting the proper hardware to install a new air compressor on car 355. This air compressor appears to be in working order, unlike the last two that once we got them under the car, they would not function properly. The last one that we put together had a high bar.

With the help of George Contrada, I was able to repair the north gate at Winkler Road Crossing after a pick-up truck damaged it on Friday. The gate will be replaced when a new one is assembled.

The rest of the day, I spent sorting through railroad ties: the good, the bad, and the ugly; so that we can get them prepared for main line tie replacement. Once those are sorted out, I need to get the tie inserter running again. Between that and the tie handler, we will have a semblance of a production job.

And, yes it is that time of year again. Galen Semprebon was caught out behind the Visitor Center unloading materials for Rails to the Darkside! In fact, the path is nearly constructed between the mainline and the Visitor Center. I guess that is my hint to begin installing the lighting.

Sunday, July 24, 2011

Catching Up

Its hard to imagine how long it has been since I have last posted. Unfortunately, long hours at work have gotten in the way of my ability to post. But enough about me, I know you are all looking for what has happened at the museum over the past two months!

Train Shed

Tracks 1 and 1A have been completed under the Train Shed of the Visitor Center. Galen Semprebon led the effort with the help of a number of other people to get the track built, temporary trackage from the siding to the storage tracks built, and the cars moved under the Train Shed. Connecticut Company car 1739 and Connecticut Company Work Car 0206 have both been moved under cover on those tracks.

New Orleans Public Service car 836

Work has been steadily progressing on car 836. Pat McCann, our resident machinist, has set up the wheel lathe with a tracing tool, and with the help of Chris Chestnut, has been preparing to make the first cut on the wheels. Yesterday, work has started on the turning of the first wheelset for 836.

Connecticut Company car 1326

While the car was in the shop for its yearly inspection and maintenance, the window sills on the car were sanded down and painted by John Pelletier, our shop foreman.

Springfield Terminal Railway car 16

John Pelletier has milled the wood to replace the floor in the operators area of the car. The floor does have a couple of weak spots that are being monitored. As time allows, the car will be moved to the shop to have the floor in that area replaced, before it becomes an issue. Phil Godeck took the time to remove the trolley hook and replace the support board underneath it. The board was detereorating and needed to be replaced. It was interesting to note, that since the car had returned to service, that hook was installed with the open part facing the wrong direction. This problem was corrected when the support board was replaced.

Illinois Terminal PCC 451

Kevin Mitchell has started to work on car 451 as his Eagle Scout Project. So far, him and his father have begun to sand down one side of the car.

Bangor & Aroostook Railroad Caboose

Work has been ongoing on the caboose. George Contrada and Xian Clere have removed the carpet and particle board that was covering the floor. While this was going on, I spent time on the roof, removing the roofing paper. Unfortunately, the roof was in worse shape than we had suspected and the roof boards will need to be replaced as well.

Track

Last weekend, I led a work crew to replace ties east of Winkler Road. In total, nine ties were replaced. We were able to use car 16 to transport people and tools, and the Tie Handler with a push car to move ties. Throughout the summer, we hope to be able to replace more ties as the time allows.

Library

Peg Hoffman has begun to work in the library cateloging the many books that we have. Meanwhile, a community service volunteer has been organizing the magazines that we have. We were surprised to find that we have quite a few complete sets of different railroad magazines.

Sunday, May 15, 2011

Rail Bonds

Throughout the day Saturday, Ben Wallace and I had to look for the tools to replace rail bonds. Once we were able to find what we needed (some tools being in the car shop), we proceeded out on the line and replaced two rail bonds. The rail bonds are necessary to allow for the signal system to function properly.

Up in the car shop, John Pelletier and Galen Semprebon were working with a crew of people to set up a gantry over the wheel lathe. This will be used to hoist the wheel set (wheels and axle) up onto the lathe for turning the wheels down. The wheel sets on New Orleans Car 836 are set to be turned down to eliminate the thin flanges that are on the wheels. Also, work was progressing on Illinois Terminal PCC 451. The "rain gutters" on the side of the car were sanded down and primed and work was ongoing on fixing a rot hole on the side of the car.

In Kelly Yard, Xian Clere has worked with Rob Levesque and Brandon Clark to replace the broken rail. The old rail was removed and the new rail was installed over the week. After borrowing a drill from the fire museum, holes for the guard rail bolts were drilled in the new rail and the guard rail was installed. There is still more work to be accomplished in Kelly Yard, but it is much better than it was at the end of last season.

Work is also progressing on the Bangor & Aroostook Railroad Caboose. George Contrada stripped the carpet from the interior of the caboose. Soon, the siding will be stripped and replaced.

Be sure to stop down for the Flea Market at the museum on this coming Saturday, May 21st! There will be over 100 vendors!

Sunday, April 24, 2011

Track 1 of Train Shed Takes Shape

Saturday was a very productive day at the museum. Galen Semprebon, along with his son Brian, led a group of community service volunteers in building track 1 under the Train Shed of the Visitor Center. While doing this, they were able to learn some basic track building principles, such as lining, spiking, and gaging.

Up in the shop, John Pelletier was busy working on a hoist for the wheel lathe. One axle is out from underneath New Orleans Car 836 so once the hoist and tooling are ready, the project can begin.









John Cummins and I were busy working on clean up projects of the property. Some of the area by the Section Houses have been cleared of the material stored there. It is hoped that this will all be able to be cleared. In the past week, a dump truck and flatbed truck have been removed from the property. The tie inserter (rusted yellow piece of equipment) that has been sitting next to the Bradley People Movers has been dragged out of there to the top of the parking lot. The owner of it is supposed to have it removed by the Annual Meeting. In moving it, we were able to rescue a track jack that was buried under it.

On the public side, despite the rain, the museum did exceptionally well on Saturday, Easter Bunny Fun Day. Every time I looked up front, the parking lot was full and operations was running double sections of cars.

Sunday, April 17, 2011

And the Trucks are Finally off the Front Lawn!

Over the weekend, a lot was accomplished at the museum. I started off the day in Kelly Yard with a hard working crew of volunteers. We were able to replace three more switch timbers in the yard before lunch. I was also able to get the hi rail gear working on our hi rail truck. Pat McCann was able to cut a bit off of the handle for the hi rail gear so that we are able to use it easily. Before, it was hitting the ground before the hi rail gear was fully up.

In the car shop, Galen Semprebon and John Pelletier were able to jack up New Orleans car 836 and pull the truck out from under it. The car is in the shop to have the wheelsets fixed due to thin flanges. The truck was removed from under the car and disassembled.

John Cummins and Morgan von Eisengrein were able to help me move the two sets of Peckam trucks off of the front lawn. For a long time, they have been an eyesore in the corner of the front lawn. They are now sitting on the truck track on the back side of the property. We were also able to move Connecticut Company car 771 (Consolidated Railway car 189) back under the train shed and move the snow plow blade for Gardner & Templeton Snow Plow 12 back in front of the snow plow.

Xian Clere spent a good portion of the weekend working on the computers. All of the old printers, copiers, computers, and monitors that are broken or otherwise unusable have been moved outside for a company to recycle. They are willing to dispose of them free of charge because we are a non-profit.

Overall, a lot was able to get accomplished over the weekend. We are open all week this week for school vacation week and next Saturday is Easter Bunny Fun Day!