Floor Replacement

Work on the floor of the operator's vestibule of Springfield Terminal Railway car 16 has commenced. The floor between the controller and the step has been removed and replaced with new wood. Over the years, the floor has worn paper-thin from the foot traffic through the car. The new tongue-and-groove flooring has been installed and will be painted once the warmer weather in the spring allows. This winter, we hope to assemble a complete set of heaters for the car and wire and install golden glow headlights on the car.

On the other track in the shop, Boston Elevated Railway car 5645 has been jacked and the motors removed. One armature was sent out to an electrical repair shop and repaired. Now that it was returned, a second will be sent out. Meanwhile, inside the car, the floor is being replaced where it has buckled.

Back in the Visitor Center, work is progressing quite quickly in disassembling Winterfest. The G Gauge table is almost completely disassembled. Soon, we will be able to move cars back into the Visitor Center.

No comments:

Post a Comment