Monday, November 29, 2010

Winter Work Space

Now that Thanksgiving has come and gone, we are into Winterfest full swing. Since the line and the hall are done, we were able to get back to some other things at the museum. Galen Semprebon began to set up a workshop in the upstairs storage rooms that were originally built as a projection room. This workshop will become an area for the shop staff to work during the cold months on small parts like brake stands, door motors, and windows. From mid December to mid March, it is much too cold to work in the shop because there is no heat.

Out back, Paul and Todd Chicoine continued to work on grading the parking area behind the Fire Museum. This serves two purposes. It will allow us to move trucks and other construction equipment out back, and it will allow the Bus Museum to get their UConn bus out which has been sitting amongst the trees for a long time. The trolley poles that were sitting in the parking lot have been moved as well.